An extra floor on a shophouse, a new use for an office unit, or recurring corrosion in a car park creates different structural questions. The scope needs to reflect the affected members, intended loading, and access within the property.
Struktura helps owners, property managers, consultants, and contractors plan assessment, repair, and strengthening of existing residential and commercial buildings. We discuss the change or defect first, then define the information, evaluation, and design needed before construction is specified.
When to Request a Structural Review
- Additional floors, a mezzanine, openings, or a substantial renovation are planned.
- A shophouse or commercial space will receive a different use or heavier equipment.
- Cracking, spalling, exposed reinforcement, corrosion, or deflection is observed.
- Car park slabs, ramps, beams, or columns show recurring deterioration.
- The existing drawings are incomplete or previous alterations are not recorded.
- An owner needs engineering recommendations before comparing repair proposals.
Choose the Scope for Your Building
Homes and shophouses
For homes and shophouses, identify the current arrangement and the proposed renovation, additional floor, or new use. The review may need to follow loads through slabs, beams, columns, connections, and foundations. Wall cracking alone does not explain the condition of the whole building, and adding reinforcement to one member does not establish the capacity of the remaining supports.
Offices, apartments, hotels, and shopping centres
Fit-outs, changes of use, equipment, storage, and openings may affect particular floors or supporting members. Record the location, weight, support points, and access requirements of proposed changes. Occupancy and interfaces with other building services need to be reflected in the investigation and work sequence.
Car parks and parking buildings
Car parks have their own exposure and access concerns: water ingress, concrete deterioration, corrosion, vehicle routes, ramps, and local impact damage. Repairing a surface or applying a protective finish is different from increasing member capacity. Identify the cause and extent of deterioration before selecting repair, protection, or strengthening.

Start with the Change You Want to Make
An owner considering another floor needs a different engineering answer from a property manager dealing with deteriorated parking slabs. State the intended outcome in the enquiry so the investigation and design can address the affected parts of the building.
| Your situation | What needs to be established | Information that helps |
|---|---|---|
| Add a floor or alter a shophouse | Capacity and load transfer through the affected existing members and foundations; details required for the proposed arrangement. | Existing and proposed layouts, intended use, available drawings, photographs and alteration history. |
| Change a unit to a different business use | Effect of equipment, storage, people, services, or openings on the affected floor and supports. | Proposed activity, equipment data, support positions, fit-out layout and relevant load information. |
| Repair recurring building damage | Cause, extent, affected elements and the distinction between structural defects and finishes. | Damage history, previous repairs, photographs with locations, leakage or movement records. |
| Rehabilitate a car park | Condition of slabs, beams, ramps and columns; causes of deterioration; repair, protection and any strengthening requirement. | Inspection records, damage map, traffic arrangement, access constraints and existing drawings. |
Where the existing building differs from the drawings, identify which information must be verified before design. This may affect whether an initial proposal covers investigation only or also includes a defined repair and strengthening package.
From Assessment to a Buildable Repair Scope
The structural assessment service can define inspection, records review, material checks, and the capacity evaluation needed for the affected areas. Missing geometry, reinforcement, or material information may require site verification before a design can be completed.
Depending on the findings, the scope may involve crack repair, concrete reinstatement, corrosion treatment, FRP/CFRP strengthening, steel plate reinforcement, jacketing, or work to the supporting structure. The substrate, geometry, required capacity, exposure, and available access influence the choice. A design and consultancy scope should state the calculations, drawings, specifications, and quantities needed for tender or construction.
Which Type of Intervention Fits the Requirement?
The useful distinction is the function the work must deliver. An owner may need local deterioration repaired, a damaged member reinstated, extra capacity for a proposed use, or a combination of these. Agree that objective before comparing methods or quantities.
| Work package | Purpose to agree | Practical considerations |
|---|---|---|
| Concrete repair and reinforcement treatment | Address a defined area of deterioration and reinstate the repair zone. | Cause of deterioration, preparation limits, condition behind the visible surface, access and protection. |
| FRP/CFRP reinforcement | Provide a designed strengthening arrangement on suitable concrete members. | Substrate quality, bonding faces, fibre direction, anchorage, protective requirements and finish interfaces. |
| Steel reinforcement or connection details | Provide a designed load-transfer or strengthening arrangement. | Space, connections, access for installation, corrosion protection and interference with services or finishes. |
| Concrete or steel jacketing | Strengthen a member to an agreed structural detail. | Added dimensions, floor and foundation interfaces, temporary support and construction sequence. |
| Foundation or support intervention | Address the verified support requirement or movement-related issue. | Available foundation information, site access, cause of movement and connection to the building above. |
In a retail unit, lost space or restricted headroom can affect the usability of the proposed solution. In an apartment or hotel, access through occupied areas and reinstatement of finishes may have a significant effect on delivery. In a car park, traffic routing, working height, water ingress, and the sequence for reopening zones need to be considered alongside the structural detail.
What to Prepare for Your Property
Homeowners and shophouse owners: describe the planned change and the current concern. Provide the existing layout, approximate building arrangement, photographs, and any drawings or previous reports available. The first discussion can identify whether site verification and a capacity evaluation are needed before renovation drawings or contractor quotations are developed.
Commercial and residential property managers: identify the affected floors, units, common areas, or supporting members. Explain tenancy arrangements, operating hours, equipment movement, access for inspection, and any restrictions on noise or dust. This helps define the inspection boundary and the feasibility of a staged construction package.
Car park owners and operators: map recurring leaks, spalling, corrosion, impact damage, damaged joints, and affected vehicle routes. Include the proposed future use and any loading change. A repair programme may need both structural work and treatment of the deterioration source; finish renewal alone should not be priced as a complete structural response.
Scope, Deliverables, and an Occupied-Building Programme
For an investigation package, agree the areas to inspect, available records to review, testing or verification where needed, and the reporting purpose. For a design package, specify the affected elements and the calculations, drawings, specifications, quantities, and technical clarifications required for procurement or construction.
The execution proposal should describe how the following are handled:
- Access to units, ceilings, structural faces, and supporting areas required by the detail.
- Removal, protection, relocation, and reinstatement of finishes or services, with responsibilities stated.
- Temporary support, exclusion zones, and restrictions on occupation or loading.
- Inspection before repair zones are covered or a subsequent installation stage proceeds.
- Material waiting times, protection of completed work, and the requirements for area handover.
A phased programme can be discussed, but the owner should know what makes each zone ready to start and ready to return to use. This is especially useful where tenants, hotel operations, or parking revenue depend on access to particular areas.
Cost Factors Worth Defining Before Tender
Two prices may differ because they include different investigation, design, repair boundaries, access arrangements, or reinstatement responsibilities. Compare these items explicitly rather than treating the reinforcement material as the entire package.
For early budgeting, identify which quantities can be estimated from reliable records and which depend on opening up or additional verification. Ask how hidden deterioration and changes to the agreed design will be reviewed. The contract documentation should distinguish investigation, design, structural work, finishes, temporary works, and any owner-managed tasks.
Bring the proposed use or renovation layout to the first discussion. It gives the engineering team a concrete decision to address and helps procurement request proposals that can be compared on the same basis.
From Discussion to an Agreed Work Scope
- Share the project objective, location, available records, and the decision your team needs to make.
- Define inspection, verification, testing, and capacity review where the existing information is insufficient.
- Agree recommendations, design deliverables, quantities, and responsibilities before comparing construction proposals.
- Plan the access, work sequence, inspection points, and handover requirements for the agreed construction scope.
Data to Send for a Proposal
Send the building location and use, affected floors or members, proposed renovation or additional loads, drawings, damage photographs, occupancy constraints, and target schedule. Previous reports and modification history are useful where available. If drawings are missing, explain what is known so the required site verification can be identified.
Investigation, design, temporary works, and construction should be identified explicitly in the proposal. Survey fees are waived only after a PO has been issued or a contract has been signed, and the down payment has been received.
Frequently Asked Questions
Can a shophouse receive another floor without strengthening?
Only an evaluation of the existing structure and proposed loading can answer this. The scope may need to establish the condition and capacity of the foundations and other supports as well as the members immediately below the new floor.
Does cosmetic repair address a structural crack?
A surface repair does not establish that the underlying cause has been resolved. Describe the crack history, affected element, previous repairs, and any planned load changes so the investigation can be defined.
Can tenants remain in the building?
Continued occupation depends on the affected areas, temporary support, access, isolation, and approved work sequence. Any restrictions need to be agreed for the actual project; uninterrupted occupation is not assumed.
Can you review both a private home and a large commercial property?
The service group covers both. The scope is defined by the building arrangement, affected elements, planned change or defect, available information, and the investigation and design needed for that particular decision.
Why does a car park need its own repair scope?
Vehicle routes, ramps, water ingress, deterioration, working height, and phased access affect the work. The review should distinguish surface maintenance, repair of structural deterioration, and any capacity requirement.
Will the proposal include reinstating ceilings, finishes, or services?
Only where included in the agreed scope. Identify removal, protection, relocation, and reinstatement responsibilities explicitly so the owner can compare the complete cost and programme.
Can you prepare a design package for another contractor to price?
Yes, when that is the agreed deliverable. Define the calculations, drawings, specifications, quantities, issue purpose, and any tender clarification or site support required.
What if additional deterioration is found after opening up?
Agree how findings will be recorded, reviewed, and approved before extending the repair or changing the design. An early quotation should distinguish confirmed quantities from assumptions requiring site verification.
Explore Related Services
Start with structural assessment, define engineering and design deliverables, or discuss a suitable FRP/CFRP installation scope. Browse all six structure types.
